The concrete compaction stage aims to remove the air trapped in the concrete mixture. If left unchecked, the trapped air will cause the concrete to become porous. Compaction is carried out immediately after the pouring process is complete and the concrete mixture is still in a plastic state. Compaction can be done by pricking the concrete castings or by vibrating. Currently, there are tools that are specifically designed to speed up the process of concrete compaction. This tool called a concrete vibrator is capable of producing vibrations to the entire surface of the concrete at a certain radius so that the concrete mixture is completely solid without the air space being trapped. Meanwhile, you may call the trusted Special Inspections in Redlands CA if you want to inspect the quality of your concrete structure professionally.

Leveling Concrete Surfaces

If the concrete compaction process has been completed, the work is continued by leveling the concrete surface. In simple terms, the process of leveling the concrete surface can be done by using blades and level boards. Meanwhile, to flatten the surface of the cast floor quickly, you can use tools such as power trowel. This tool serves to flatten the surface of the cast floor in 75% dry conditions.

Concrete Treatment

This is the final stage in concrete processing, which is concrete treatment. This treatment needs to be done so that the cement and water reaction process takes place well. The treatment that is done is to keep the concrete surface moist until the reaction process reaches a specified time of approximately 28 days.

If the concrete surface is not kept in moisture, then the water content in the concrete mixture will come out so that in the end the quality of the concrete will decrease or cracks will appear on the surface. Moisture can be maintained by watering the surface of the concrete, inundating the concrete surface, or putting wet sacks on the concrete surface.